Job:
Value:
Duration:
Square Feet:
General Contractor:
Floors: |
Rockville
Library
$1,800,000
6 Months
100,000 SF
Forrester
3, 2 Library, 1 Admin Office. |
Features:
Very high end fast track project with many complicated components
including full height case type radius walls, round, radius,
multiple step bulkhead. Grand stair feature includes round
bulkhead, columns follow on radius with multiple drywall
reveal and GRG columns, intense coordination between multiple
trades.
| Additional
Pictures: (click
to enlarge) |
 |
 |
 |
|
|
Job:
Location:
Value:
Duration:
General Contractor:
Description: |
Io Piozza
Shirlington, VA
$4,500,000 plus
12 Months
Bovis Lending Lease
305,000SF, 244 unit, 13 story highend condo. |
Work Performed :
- Exterior light gage metal framing.
- Exterior sheathing and building wrap.
- Interior metal framing and blocking.
- All the drywall and bolt insulation.
- Acoustical ceilings.
- Metal decorative cornice on exterior of building.
|
|
|
|

"Cindell helped us work through all sorts of issues.
It's the first time we've worked with them and we'll definitely use them
again."
-Alan Bender
Assistant Project Manager
Bovis Lend Lease
|